Basic Description
Equipped with all the zero leak bidirectional checking sole-noid valves, this power unit is made for your operation of two independent circuits. Which are respectively to the key and subordinate platforms with the double scissors lift. Two cut-off valves are utilised for lowering the machine manually in situation of power reduction. If extra independent circuits are essential for your application please get hold of us for availability.
Remark: one. Please talk to our sales engineer for that unique pump displacement, motor energy or tank capacity.
two. CSA or UL certified motors are available on request.
Particular Notes
one. The AC motor is of S3 duty cycle, which may only operate intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
2. Clean the many hydraulic parts concerned ahead of installation of the electrical power unit.
3. Viscosity with the oil shoud be 15~46 cst,and also the oil must be clean and totally free of impurities,N46 hydraulic oil is advisable.
four. The electrical power unit ought to be mounted vertically.
5. Check the oil degree from the tank soon after the initial operating with the power unit.
six. Oil modifying is required just after the initial 100 operation hours,afterwards once just about every 3000 hrs.
Energy UNITS FOR DOUBLE-SCISSORS LIFT
Tags: